Works included the installation of a new hot and cold water reticulation system as well as the installation of a Reverse Osmosis system required by the Dialysis Clinic. New core holes and drainage points were required to supply the new layout. TMV’s and Back-flow prevention valves were installed to maintain compliance with Local and Australian standards.