Servicing the ACT and surrounding areas.

SECTOR: Government

Parliament House, Main Production Kitchen Upgrade

Contemporary Plumbing installed and altered hydraulic works to suit the new layout of MPK at Parliament House. The in- ground component of the project included the installation of HDPE drainage lines to withstand the high temperature waste the MPK would be disposing. This included the cutting, removal and reinstatement of concrete. An upgraded Hot water reticulation line was installed to meet the required demands of the kitchen. An ‘e-Water’ system was installed which included Sanitising and Cleaning water outlets at all sinks and hand basins. Work was completed on-time, on-budget and with zero defects.

Enquire now